• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Left Screed Worklight Wiring Harness-- Disconnect/Connect.
ELECTRIC HEATER WIRING HARNESS REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1024    1025    1026    1027    1028  1029  1030    1031    1032    1033    1034  
img
.
TM 5-3895-385-23-2
0390
Left Screed Worklight Wiring Harness Removal -- Continued.
Figure 2. Left Screed Worklight Wiring Harness -- Removal/Installation.
END OF TASK
Left Screed Worklight Wiring Harness Installation
1. Route left screed worklight wiring harness through pass-through (Figure 2, Item 1).
2. Connect W21 J2 (Figure 2, Item 3) onto left screed worklight (Figure 2, Item 2).
3. Connect W21 J1 (Figure 1, Item 2) onto W1 J42 (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Install cable ties where necessary.
2. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
END OF TASK
END OF WORK PACKAGE
0390-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.