• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Right Side Screed Control Box Wiring Harness Installation
Figure 1. Right Pedestal Assembly Communication Cables.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  992    993    994    995    996  997  998    999    1000    1001    1002  
img
. .
TM 5-3895-385-23-2
0386
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
COMMUNICATION CABLE REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Engine off (TM 5-3895-385-10)
3, Item 64)
BATTERY DISCONNECT switch OFF (TM 5-3895-
Materials/Parts
385-10)
Cable ties (WP 0439, Vol 3, Item 99)
Drawings Required
Lock washer (3) (WP 0439, Vol 3, Item 124)
Foldouts
Estimated Time to Complete Task
Lock washer (30) (WP 0439, Vol 3, Item 108)
3 hr
Personnel Required
91L
COMMUNICATION CABLE REMOVAL AND INSTALLATION
CAUTION
Tag and label electrical wires prior to removal. Electrical wires must be installed correctly for
proper operation. Failure to comply may cause damage to equipment.
NOTE
It will be necessary to remove cable ties from cables.
Note routing of wiring harness to aid in installation.
0386-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.