Figure 2. Left Side Screed Control Box Wiring Harness.
RIGHT SIDE SCREED CONTROL BOX WIRING HARNESS REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  987    988    989    990    991  992  993    994    995    996    997  
img
.
TM 5-3895-385-23-2
0384
Left Side Screed Control Box Wiring Harness Installation
1. Connect W14 J3 (Figure 2, Item 1) to Y12 (Figure 2, Item 9) P3.
2. Connect W14 J4 (Figure 2, Item 10) to Y12 (Figure 2, Item 9) P2.
3. Connect Y12 (Figure 2, Item 9) P1 to W6 J3 (Figure 2, Item 8).
4. Connect W14 J5 (Figure 2, Item 4) to W6 J1 (Figure 2, Item 5).
5. Connect W14 J2 (Figure 2, Item 3) to screed auger/conveyor keypad (Figure 2, Item 7).
6. Connect W14 J1 (Figure 2, Item 2) to screed horn keypad (Figure 2, Item 6).
7. Raise screed control box cover (Figure 1, Item 4), and install clamps (Figure 1, Item 2) and two screws
(Figure 1, Item 3) into mounting bracket (Figure 1, Item 1).
END OF TASK
END OF WORK PACKAGE
0384-4