TM 5-3895-385-23-2
0385
Right Side Screed Control Box Wiring Harness Installation
1. Connect W2 J3 (Figure 2, Item 1) onto Y11 (Figure 2, Item 9) P3.
2. Connect W2 J4 (Figure 2, Item 10) onto Y11 (Figure 2, Item 9) P2.
3. Connect Y11 (Figure 2, Item 9) P1 onto W6 J4 (Figure 2, Item 8).
4. Connect W2 J5 (Figure 2, Item 4) onto W6 J5 (Figure 2, Item 5).
5. Connect W2 J2 (Figure 2, Item 3) onto screed auger/conveyor keypad (Figure 2, Item 7).
6. Connect W2 J1 (Figure 2, Item 2) onto screed horn keypad (Figure 2, Item 6).
7. Raise screed control box cover (Figure 1, Item 4), and install clamps (Figure 1, Item 2) and two screws
(Figure 1, Item 3) into mounting bracket (Figure 1, Item 1).
END OF TASK
END OF WORK PACKAGE