TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
VARIABLE AUGER CHARGE PUMP REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
3, Item 64)
Estimated Time to Complete Task
Drain pan (WP 0440, Vol 3, Item 15)
70.3 hr
Materials/Parts
Lock washers (2) (WP 0439, Vol 3, Item 107)
O-ring (WP 0439, Vol 3, Item 71)
Wiping rag (WP 0439, Vol 3, Item 89)
Personnel Required
91L
0322-1