• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PROPULSION PUMP REMOVAL AND INSTALLATION - Continued
Figure 1. Load Sense Hydraulic Pump.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  549    550    551    552    553  554  555    556    557    558    559  
img
. .
TM 5-3895-385-23-2
0321
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
LOAD SENSE HYDRAULIC PUMP REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Drain pan (WP 0440, Vol 3, Item 15)
Engine removed (WP 0323)
Estimated Time to Complete Task
Suitable lifting device (200 lb (91 kg) minimum)
70.4 hr
Web sling (WP 0440, Vol 3, Item 66)
Materials/Parts
Lock washers (2) (WP 0439, Vol 3, Item 107)
O-ring (2) (WP 0439, Vol 3, Item 72)
Wiping rag (WP 0439, Vol 3, Item 89)
0321-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.