• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VARIABLE AUGER PUMP REMOVAL AND INSTALLATION - Continued
Figure 1. Propulsion Pump.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  545    546    547    548    549  550  551    552    553    554    555  
img
. . .
TM 5-3895-385-23-2
0320
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
PROPULSION PUMP REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Drain pan (WP 0440, Vol 3, Item 15)
Double hydraulic pump drive oil drained (WP 0318)
Suitable lifting device (200 lb (91 kg) minimum)
Charge pump removed (WP 0322)
Estimated Time to Complete Task
Web sling (WP 0440, Vol 3, Item 66)
81.1 hr
Materials/Parts
Lock washers (2) (WP 0439, Vol 3, Item 107)
O-ring (WP 0439, Vol 3, Item 76)
Wiping rag (WP 0439, Vol 3, Item 89)
0320-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.