TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
HYDRAULIC OIL RETURN FILTER ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
91L
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Equipment Conditions
3, Item 64)
Materials/Parts
Gasket sealant (WP 0439, Vol 3, Item 96)
Estimated Time to Complete Task
Hydraulic oil (WP 0439, Vol 3, Item 36)
6 hr
Lock washer (6) (WP 0439, Vol 3, Item 117)
O-ring (WP 0439, Vol 3, Item 76)
O-ring (WP 0439, Vol 3, Item 77)
O-ring (WP 0439, Vol 3, Item 78)
0307-1