• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Screed Extension Vibrator Hydraulic Hose Removal -- Continued
SCREED EXTENSION HYDRAULIC CYLINDER HOSE REMOVAL, INSPECTION, AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  375    376    377    378    379  380  381    382    383    384    385  
img
.
TM 5-3895-385-23-2
0283
Screed Extension Vibrator Hydraulic Hose Installation -- Continued.
7. Connect hydraulic hose 107 (Figure 1, Item 13) onto screed vibrator return block (Figure 1, Item 12) and left
screed extension (Figure 1, Item 17).
8. Connect hydraulic hose 108 (Figure 1, Item 11) onto screed extension vibrator flow divider (Figure 1, Item
10) and left screed extension (Figure 1, Item 17).
END OF TASK
FOLLOW-ON TASK
1. Verify proper operation.
2. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedures
(SOP).
END OF TASK
END OF WORK PACKAGE
0283-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.