• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SCREED LIFT HYDRAULIC CYLINDER HOSE REMOVAL, INSPECTION, AND INSTALLATION - Continued
Figure 1. Screed Extension Vibrator Hydraulic Hose.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  372    373    374    375    376  377  378    379    380    381    382  
img
. .
TM 5-3895-385-23-2
0283
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
SCREED EXTENSION VIBRATOR HYDRAULIC HOSE REMOVAL, INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Cap and plug set (WP 0440, Vol 3, Item 11)
Screed extensions fully extended (TM 5-3895-385-
10)
Drain pan (WP 0440, Vol 3, Item 15)
Hydraulic oil cool (TM 5-3895-385-10)
Materials/Parts
Estimated Time to Complete Task
Wiping rag (WP 0439, Vol 3, Item 89)
2 hr
SCREED EXTENSION VIBRATOR HYDRAULIC HOSE REMOVAL, INSPECTION, AND INSTALLATION
NOTE
Some hydraulic oil will leak out of hoses and connection points when disconnecting or connecting
components. Have a drain pan and rags in place to capture hydraulic oil.
0283-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.