Figure 2. Spraydown Pump Filter Screen.
HYDRAULIC OIL SERVICE

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  353    354    355    356    357  358  359    360    361    362    363  
img
.
TM 5-3895-385-23-2
0279
Spraydown Pump Filter Screen Installation
Install new filter screen (Figure 2, Item 3), new gasket (Figure 2, Item 2) and strainer bottom (Figure 2, Item 4)
onto strainer top (Figure 2, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
2. Verify proper operation.
3. Dispose of cleaner solution and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE