• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Spraydown Nozzle -- Removal/Installation.
SPRAYDOWN PUMP AND SPRAYDOWN PUMP FILTER SCREEN REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  348    349    350    351    352  353  354    355    356    357    358  
img
. .
TM 5-3895-385-23-2
0278
FOLLOW-ON TASK
1. Install operator platform worklights (WP 0396).
2. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
3. Verify proper operation.
4. Dispose of cleaner solution and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE
0278-5/6 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.