Fuse Box Installation
Figure 1. Spraydown Hose Reel -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  344    345    346    347    348  349  350    351    352    353    354  
img
. . .
TM 5-3895-385-23-2
0278
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
SPRAYDOWN HOSE REEL AND SPRAYDOWN NOZZLE REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Drain pan (WP 0440, Vol 3, Item 15)
Engine off (TM 5-3895-385-10)
Materials/Parts
BATTERY DISCONNECT switch OFF (TM 5-3895-
Lock washers (4) (WP 0439, Vol 3, Item 110)
385-10)
Wiping rag (WP 0439, Vol 3, Item 89)
Operator platform worklights removed (WP 0396)
Estimated Time to Complete Task
0.5 hr
SPRAYDOWN HOSE REEL AND SPRAYDOWN NOZZLE REMOVAL AND INSTALLATION
NOTE
Spray down hose wheel and spraydown nozzle removal and installation steps are the same for
both sides of the Bituminous Material Paving Machine (BMPM). Left side shown.
0278-1