• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Right Auger Fail To Turn Troubleshooting Procedures -- Continued
Table 1. Right Track Forward EDC Fault Troubleshooting Procedures -- Continued

Field Maintenance Manual For Bituminous Material Paving Machine - 1 Page Navigation
  600    601    602    603    604  605  606    607    608    609    610  
img
. . . .
TM 5-3895-385-23-1
0145
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
RIGHT TRACK FORWARD EDC FAULT
INITIAL SETUP:
Test Equipment
References -- Continued
Multimeter (WP 0440, Vol 3, Item 37)
WP 0373, Vol 2
Personnel Required
WP 0399, Vol 2
91L
WP 0443, Vol 3
Assistant
WP 0451, Vol 3
References
Equipment Conditions
WP 0180
Engine off (TM 5-3895-385-10)
WP 0320, Vol 2
TROUBLESHOOTING PROCEDURES
Table 1. Right Track Forward EDC Fault Troubleshooting Procedures.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. Propel Controller Offline fault
1. Turn keyless engine switch to
indicated on fault screen.
the AUX position (TM 5-3895-
385-10), but do not start engine.
2. Check fault screen for PROPEL
1. If fault is found, turn keyless
CONTROLLER OFFLINE fault.
engine switch to the OFF
position (TM 5-3895-385-10),
and proceed to WP 0180.
2. If no fault is found, turn keyless
engine switch to the OFF
position (TM 5-3895-385-10),
and proceed to next malfunction.
2. Propulsion pump malfunction.
1. Locate W1 J18 at propulsion
pump (WP 0373, Vol 2).
.
2. Turn keyless engine switch to
the AUX position (TM 5-3895-
385-10), but do not start engine.
0145-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.