• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RAISING FUME VENT
LOADING BMPM ONTO TRAILER

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  314    315    316    317    318  319  320    321    322    323    324  
img
. . . . . . . . . . . . . . . . . . .
TM 5-3895-385-10
0026
OPERATOR MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
HIGHWAY TRANSPORT
INITIAL SETUP:
Equipment Conditions -- Continued
Materials/Parts
Seat slide assembly pushed in (WP 0006)
Ratchet strap (2) (WP 0031, Item 12)
Personnel Required
Engine on (WP 0006)
12V (2)
Screed fully raised (WP 0006)
References
Hopper wings fully closed (WP 0006)
FM 21-60
Screed extensions fully retracted (WP 0006)
WP 0002
Cutoffs fully raised (WP 0006)
WP 0004
Augers fully raised (WP 0006)
WP 0022
Truck hitch fully retracted (WP 0006)
WP 0025
Fume vent lowered (WP 0026)
Equipment Conditions
End gates removed (WP 0014)
Time Required
0.3 hr
Cutoffs removed (WP 0016)
Bolt-on screed extension kit removed (WP 0015)
INTRODUCTION
1. Check with proper authorities to obtain necessary permits or licenses before transporting Bituminous Material
Paving Machine (BMPM).
2. Ensure cooling system of BMPM has proper antifreeze protection while in transit and for climate at destination
(WP 0022).
END OF TASK
0026-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.