TM 5-3895-385-10
0026
LOADING BMPM ONTO TRAILER -- CONTINUED.
Figure 2. BMPM Ramp Loading.
5. Move BMPM to base of ramp with the screed end leading (Figure 2) using ground guide assistance (FM 21-
60).
6. Guide BMPM up ramp slowly, screed first.
7. Maneuver the BMPM to the desired position.
8. Return joysticks to the neutral position (WP 0006).
11. Set BATTERY DISCONNECT switch to OFF (WP 0004).
12. Secure BMPM on trailer bed with tie downs In Accordance With (IAW) lift and tie down shipping data plate on
END OF TASK