TM 5-3895-373-34
E.
INSTALL.
1.
INSTALL TOP CHAIN COVER PLATE ONTO
AUGER/CONVEYOR DRIVE CHAIN HOUSING.
NOTE
Hydraulic hose routed over the top of top
chain
cover
plate
may
need
to
be
repositioned temporarily to gain access to
hex head cap screws and to allow for
installation of top chain cover plate.
a.
Position top chain cover plate (23) on top of
auger/conveyor drive chain housing.
b.
Install flat washers (22) onto hex head cap
screws (21).
Thread locking compound can cause eye
damage. Wear safety goggles/glasses when
using.
Avoid
contact
with
eyes.
If
compound contacts eyes, flush eyes with
water and get immediate medical attention.
c.
Apply thread locking compound to threads
of hex head cap screws (21).
d.
Install hex head cap screws (21). Tighten
cap screws to 37 lb-ft (50 Nm).
2.
INSTALL SCREED HARNESS ELECTRICAL
RECEPTACLE AND PLUG.
a.
Position
screed
harness
electrical
receptacle (20) into the rear wall of the
paving machine.
b.
Install flat washers (19), machine screws
(18), and hex nuts (17).
c.
Apply electrical insulating compound to pins
of screed harness electrical plug (16).
d.
Connect screed harness electrical plug (16)
to screed harness electrical receptacle (20).
GO TO NEXT PAGE
2-869
