TM 5-3895-373-34
2.62
REPLACE CONVEYOR DRAG PLATES AND ENGINE INSULATION PAN.
This task covers:
a. Remove
b.
Clean
c.
Replace
INITIAL SETUP
Tools:
Personnel Required:
General mechanics automotive tool kit
Two 62B construction equipment repairers. Two persons
(Item 106, Appendix D)
required to lift and remove damaged conveyor drag plates and
Crowbar (Item 35, Appendix D)
install new conveyor drag plates.
Torque wrench (Item 132, Appendix D)
Wire scratch brush (Item 13, Appendix D)
References:
TM 5-3895-373-20
Materials/Parts:
TM 5-3895-373-24P
Cleaning cloth (Item 6, Appendix B)
Cleaning solvent (Item 31, Appendix B)
Equipment Condition:
Thread locking compound (Item 13, Appendix B)
Paving machine jacked and cribbed per TM 5-3895-373-20.
Thread locking compound (Item 14, Appendix B)
Conveyor chain assembly removed per paragraph 2.61.
Thread locking compound solvent (Item 32, Appendix B)
Chain plate lid
Engine insulation pan
Front conveyor drag plate
Insulation
Lockwashers
Rear conveyor drag plate
GO TO NEXT PAGE
2-852
