TM 5-3895-373-34
F.
INSTALL Continued.
2.
INSTALL AUXILIARY PUMP ON PAVING
MACHINE.
a.
Install lockwasher (15) onto socket head cap
screws (14).
b.
Lubricate
preformed
packing
(16)
with
petrolatum.
c.
Install preformed packing (16) on pilot flange of
auxiliary pump.
NOTE
Coupling for auxiliary vibration pump
must be installed on vibration pump
shaft prior to installation of left
auxiliary pump.
d.
Align and install auxiliary pump.
NOTE
When installing right auxiliary pump,
socket
head
cap
screws
and
lockwashers will be installed and
tightened to 37 lb-ft (50 Nm).
e.
Install socket head cap screws (14).
GO TO NEXT PAGE
2-581