TM 5-3895-373-20
C.
JACKING AND CRIBBING FOR TRACK MAINTENANCE - Continued.
b.
Position jacks under frame at rear of paving
machine and under tiedown at front of paving
machine.
c.
Evenly raise one side of paving machine and
position 4 in. x 12 in. x 8 ft cribbing under paving
machine track.
d.
Lower weight of paving machine onto cribbing.
e.
Raise
other
side
of
paving
machine
by
positioning jacks under frame at rear of paving
machine and under tiedown at front of paving
machine.
f.
Evenly raise other side of paving machine and
position 4 in. x 12 in. x 8 ft cribbing under paving
machine track.
g.
Lower weight of paving machine onto cribbing.
GO TO NEXT PAGE
2-449