2.24.2. JACKING AND CRIBBING - Continued.
A. JACKING AND CRIBBING FOR NON-TRACK
MAINTENANCE Continued.
2. RAISE AND CRIB PAVING MACHINE ON 14 IN.
CRIBBING.
NOTE
During these steps, one side of the paving machine is
raised at a time.
a.
Position jacks under frame at rear of paving
machine and under frame at front of paving
machine.
b.
Evenly raise one side of paving machine.
Remove 4 in. x 12 in. x 8 ft cribbing and position
9 in. x 14 in. x 3 ft cribbing under paving
machine track.
c.
Lower weight of paving machine onto cribbing.
d.
Raise other side of paving machine by placing
jacks under frame at rear of paving machine and
under frame at front of paving machine.
e.
Evenly raise other side of paving machine.
Remove 4 in. x 12 in. x 8 ft cribbing and position
9 in. x 14 in. x 3 ft cribbing under paving
machine track.
f.
Lower weight of paving machine onto cribbing.
g.
Position cribbing under both ends of main
screed.
h.
Place the ignition switch to the RUN position and
place the screed lift switch to the down, FLOAT
position. Refer to TM 5-3895-373-10.