TM 5-3895-373-20
2.24.2. JACKING AND CRIBBING - Continued.
D.
REMOVE CRIBBING AND LOWER AFTER
TRACK MAINTENANCE.
NOTE
If using single point overhead lift per
paragraph 2.24.4, go to steps 1.a
through 1.e, 1.h, 1.1, and 1.m.
If using end lift per paragraph 2.24.4, go
to steps 1.a through 1.e, raise front of
paving machine and go to steps 1.h and
1.i. Raise rear of paving machine and go
to steps 1.1 and 1.m.
1.
REMOVE 9 IN. x 14 IN. x 3 FT CRIBBING AND
LOWER PAVING MACHINE.
a.
Start paving machine per TM 5-3895-373-10.
b.
Place throttle control switch to MAX position.
c.
Place screed lift switch to the up, RAISE
position. Fully raise screed. Refer to TM 53895-
373-10.
d.
Shut down paving machine per TM 5-3895373-
10.
e.
Remove cribbing from under screed.
f.
Position 4 in. x 12 in. x 8 ft cribbing under both
paving machine tracks.
g.
Position both jacks under frame at front of
paving machine.
h.
Evenly raise front of paving machine. Remove 9
in. x 14 in. x 3 ft cribbing.
i.
Lower weight of paving machine onto cribbing
(or to the ground if using overhead lift).
GO TO NEXT PAGE