TM 5-3895-373-20
A.
JACKING AND CRIBBING FOR NONTRACK
MAINTENANCE Continued.
1.
RAISE AND CRIB PAVING MACHINE ON 4 IN.
CRIBBING.
NOTE
During these steps, one side of the
paving machine is raised at a time.
a.
Move paving machine to level concrete pad. If
concrete pad is not available, use steel plates to
distribute jack loads over larger area.
b.
Position jacks under frame at rear of paving
machine and under tiedown at front of paving
machine.
c.
Evenly raise one side of paving machine and
position 4 in. x 12 in. x 8 ft cribbing under paving
machine track.
d.
Lower weight of paving machine onto cribbing.
e.
Raise other side of paving machine by placing
jacks under frame at rear of paving machine and
under tiedown at front of paving machine.
f.
Evenly raise other side of paving machine and
position 4 in. x 12 in. x 8 ft cribbing under paving
machine track.
g.
Lower weight of paving machine onto cribbing.
GO TO NEXT PAGE
2-443