TM 5-3895-373-202.24.2. JACKING AND CRIBBING.This task covers: a. Jacking and cribbing for non-track maintenance.b. Remove cribbing and lower after non-track maintenance.c. Jacking and cribbing for track maintenance.d. Remove cribbing and lower after track maintenance.INITIAL SETUPTools:Materials/Parts:General mechanic’s automotive tool kitCribbing, 4 in. (102 mm) x 12 in. (305 mm) x 8 ft (2,4 m),(Item 54, Appendix E) 2 eaCribbing (Item 2, Appendix D) 2 ea Cribbing, 9 in. (228,6 mm) x 14 in. (355,6 mm) x 16 in.(for track maintenance) (406,4 mm), 2 ea (for track maintenance)Hydraulic jack (Item 24, Appendix E) Cribbing, 9 in. (228,6 mm) x 14 in. (355,6 mm) x 16 in.(406,4 mm), 2 ea (for non-track maintenance) (Item 2,Appendix D)Cribbing, 9 in. (228,6 mm) x 14 in. (355,6 mm) x 3 ft (0,9 m),4 ea (for non-track maintenance)EquipmentCondition:Screed raised per TM 5-3895-373-10.Screed travel lock valve closed per TM 5-3895-373-10.Paving machine weighs approximately 21,400 lbs (9707kg). Ensure machine is securely supported beforeperforming any maintenance. Severe personal injury ordeath may occur from not supporting machineadequately prior to maintenance.A. JACKING AND CRIBBING FOR NON-TRACKMAINTENANCE.NOTEPaving machine may be driven up on 4 in. high x 12 in.wide x 8 ft long cribbing. Go to step 2.If using single point overhead lift per paragraph 2.24.4,go to step 2.b and steps 2.e through 2.k.GO TO NEXT PAGE2-442
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business