TM 5-3895-373-10
(5)
Turn the ignition switch (22) to the START
position and immediately release when the
engine starts.
(6)
Place the feeder control switches (23) on
both screed control panels to up, ON
position.
(7)
Place the auger/conveyor switches (24) to
up, ON position one at a time.
(8)
Spray all of both sets of conveyor chains
(19).
(9)
Place auger/conveyor switches (24) to
center, OFF position.
(10)
Place the feeder control switches (23) on
both screed control panels to down, OFF
position (11) Turn the ignition switch (22)
to the STOP position.
(12)
After the engine stops, turn the ignition
switch (22) to the ON position.
(13)
Close access doors.
3-30