TM 5-3895-385-23-2
0423
FOLLOW-ON TASK
1. Remove lifting device.
3. Install track tension hydraulic cylinder (WP 0426).
4. Verify proper operation.
5. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE