• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Auger Collar -- Installation.
AUGER CUTOFF REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1109    1110    1111    1112    1113  1114  1115    1116    1117    1118    1119  
img
. .
TM 5-3895-385-23-2
0402
Auger Sections Installation -- Continued.
Figure 7. Auger Shaft Support -- Installation.
8. Install auger shaft support (Figure 7, Item 3), four bolts (Figure 7, Item 1), and new lock washers (Figure 7,
Item 2) onto support frame (Figure 7, Item 4).
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Install auger cutoff assembly (WP 0403).
END OF TASK
END OF WORK PACKAGE
0402-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.