TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
AUGER CUTOFF REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Hex key, 14 mm (WP 0440, Item 25)
Equipment Conditions
Suitable lifting device (100 lb (45 kg) minimum)
Estimated Time to Complete Task
Web sling (WP 0440, Vol 3, Item 66)
3.6 hr
Materials/Parts
Cotter pin (1) (WP 0439, Vol 3, Item 79)
Lock washer (4) (WP 0439, Vol 3, Item 119)
Lock washer (WP 0439, Vol 3, Item 106)
CUTOFF ASSEMBLY REMOVAL AND INSTALLATION
NOTE
Auger assembly removal and installation steps are the same for both sides of the Bituminous
Material Paving Machine (BMPM). Left side shown.