33. Connect C10 J1 (Figure 7, Item 10) onto Y15 P1 (Figure 7, Item 9).
34. Connect C10 J2 (Figure 7, Item 20) onto C11 J1 (Figure 7, Item 19).
35. Connect C13 J1 (Figure 7, Item 18) onto C12 J2 (Figure 7, Item 17).
36. Connect C12 J1 (Figure 7, Item 1) onto Y1 P3 (Figure 7, Item 2).
37. Connect W12 J9 (Figure 7, Item 3) onto Y1 P1 (Figure 7, Item 2).
38. Connect C16 J2 (Figure 7, Item 22) onto Y15 P3 (Figure 7, Item 9).
39. Connect C16 J1 (Figure 7, Item 21) onto Y16 P1 (Figure 7, Item 24).
40. Connect W12 J8 (Figure 7, Item 8) onto Y15 P2 (Figure 7, Item 9).
41. Connect W12 J6 (Figure 7, Item 23) onto Y16 P2 (Figure 7, Item 24).
42. Connect W12 J7 (Figure 7, Item 25) onto Y16 P3 (Figure 7, Item 24).
43. Connect resistor (Figure 7, Item 4) onto Y1 P2 (Figure 7, Item 2).
44. Install lower pedestal cover (Figure 7, Item 13), three bolts (Figure 7, Item 16), new lock washers (Figure 7,
Item 15), and flat washers (Figure 7, Item 14) onto left pedestal (Figure 7, Item 12).
45. Install platform control panel (Figure 7, Item 11), 15 bolts (Figure 7, Item 5), new lock washers (Figure 7, Item
6), and flat washers (Figure 7, Item 7).