TM 5-3895-385-23-2
0386
Communication Cable Installation -- Continued.
46. Connect C6 J1 (Figure 8, Item 8) onto Y8 P1 (Figure 8, Item 7).
47. Connect C6 J2 (Figure 8, Item 18) onto C5 J2 (Figure 8, Item 17).
48. Connect C7 J2 (Figure 8, Item 16) onto C18 J1 (Figure 8, Item 15).
49. Connect W9 J3 (Figure 8, Item 2) onto C18 J2 (Figure 8, Item 1).
50. Connect C14 J1 (Figure 8, Item 20) onto Y8 P3 (Figure 8, Item 7).
51. Connect C14 J2 (Figure 8, Item 19) onto Y9 P1 (Figure 8, Item 22).
52. Connect W9 J12 (Figure 8, Item 6) onto Y8 P2 (Figure 8, Item 7).
53. Connect W9 J10 (Figure 8, Item 21) onto Y9 P3 (Figure 8, Item 22).
54. Connect W9 J11 (Figure 8, Item 23) onto Y9 P2 (Figure 8, Item 22).
55. Install lower pedestal cover (Figure 8, Item 11), three bolts (Figure 8, Item 14), new lock washers (Figure 8,
Item 13), and flat washers (Figure 8, Item 12) onto right pedestal (Figure 8, Item 10).
56. Install platform control panel (Figure 8, Item 9), 15 bolts (Figure 8, Item 3), new lock washers (Figure 8, Item
4), and flat washers (Figure 8, Item 5).
END OF TASK
FOLLOW-ON TASK
1. Install cable ties where necessary.
2. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
3. Verify proper operation.
END OF TASK
END OF WORK PACKAGE
0386-17/18 blank