• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Wires from Connector -- Removal.
Figure 6. Wiring Harness -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  98    99    100    101    102  103  104    105    106    107    108  
img
.
TM 5-3895-385-23-2
0240
Screed Control Box Removal -- Continued.
Figure 5. Screed Control Box -- Removal/Installation.
9. Remove three bolts (Figure 5, Item 4), six flat washers (Figure 5, Items 3 and 5), three locking nuts (Figure 5,
Item 6), and screed control box (Figure 5, Item 2) from screed control box lower mount (Figure 5, Item 1).
Discard locking nuts.
END OF TASK
0240-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.