• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SPRAYDOWN PROCEDURES -- CONTINUED.
INTERIM CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR (CBRN) DECONTAMINATION PROCEDURES

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  117    118    119    120    121  122  123    124    125    126    127  
img
. . . . . . . . .
TM 5-3895-385-10
0007
OPERATOR MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
OPERATION UNDER UNUSUAL CONDITIONS
INITIAL SETUP:
References -- Continued
Materials/Parts
WP 0004
Wiping rag (WP 0033, Item 15)
Personnel Required
WP 0013
12V (1)
WP 0021
References
FM 3.11.5
LO 5-3895-385-13
UNUSUAL ENVIRONMENT/WEATHER
Operation in Extreme Heat (Above 120 degrees Fahrenheit (F) (49 degrees Celsius (C)))
WARNING
Exposed skin can burn on metal in extreme hot weather. Avoid contacting metal items with bare
skin in extreme hot weather. Failure to comply may cause injury or death to personnel.
1. Remove any obstructions from Bituminous Material Paving Machine (BMPM) ventilation openings (WP 0013).
2. Check water temperature gauge on engine screen frequently for any indication of overheating (WP 0004).
END OF TASK
Operation in Dusty or Sandy Areas
CAUTION
Do not allow sand or dust to contaminate any fluids on the BMPM. Failure to comply may cause
damage to equipment.
1. Do not fill fluids in dusty or sandy areas.
2. Perform daily lubrication tasks before beginning each work day (LO 5-3895-385-13).
3. Clean exterior BMPM surfaces prior to operation with a damp wiping rag while unit is completely shut down
paying close attention to grease fittings, hydraulic cylinders, flight screws, seat assembly slides, fuel fill cap,
cleaner fill cap, and any moving parts where dust and sand could collect.
4. Service air cleaner assembly (WP 0021) daily to compensate for intake of additional dust or sand.
END OF TASK
0007-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.