PREPARATION FOR USE
PREPARATION FOR USE PAVING AREA 17 TO 20 FEET WIDE

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  70    71    72    73    74  75  76    77    78    79    80  
img
. . . . . . . . . . . . . . . .
TM 5-3895-385-10
0005
PREPARATION FOR USE PAVING AREA 8 TO 16 FEET WIDE
1. Unpack end gates (WP 0023).
2. Install end gates (WP 0014).
3. Perform Before PMCS (WP 0013).
4. Install sonic auger sensors (if required for mission) (WP 0006).
5. Raise screed fully (WP 0006).
6. Drive BMPM into position (WP 0006).
7. Turn on electric screed heater and allow screed to heat for approximately 15 minutes (WP 0006).
8. Extend screed extension to appropriate width (WP 0006).
9. Place starter blocks under screed and lower screed onto starter blocks.
10. Adjust tow point cylinders to zero (WP 0006).
11. Adjust flight screw to the null position then turn one complete turn counterclockwise (thicker) (WP 0006).
12. Adjust screed crown to appropriate level (WP 0006).
13. Open cutoffs fully (WP 0006).
14. Attach truck to BMPM using truck hitch (WP 0006).
15. Turn on augers/conveyors and select manual or automatic setting (sonic augers are required for automatic
setting) (WP 0006).
16. Adjust pile height (for automatic auger/conveyor settings) or auger/conveyor speed (for manual
auger/conveyor settings) to appropriate settings (WP 0006).
END OF TASK