TM 5-3895-373-34
F. REPLACE.
1.
INSTALL SCREED VIBRATION FLOW DIVIDER IN
SCREED.
a.
Position screed vibration flow divider (4) on
mounting bracket (10) in screed (3).
b.
Install lockwashers (9) onto bolts (8).
Thread locking compound can cause
eye
damage.
Wear
safety
goggles/glasses when using. Avoid
contact with eyes. If compound
contacts eyes, flush eyes with water
and get immediate medical attention.
c.
Coat threads of bolts (8) with thread locking
compound.
d.
Install bolts (8) through screed vibration flow
divider
(4)
into mounting bracket (10). Tighten bolts to 19
lb.-ft (26 Nm).
2.
CONNECT HYDRAULIC FITTINGS AND INSTALL
COVER PLATE.
Hydraulic fitting sealant can cause
eye damage or skin irritation. Wash
after skin contact. Wear safety
goggles/glasses when using. Avoid
contact with eyes or skin. If sealant
contacts eyes, flush eyes with water
and get immediate medical attention.
a.
Coat threads of elbows (5) with
hydraulic fitting sealant.
b.
Attach hoses (6) and tube (7) to elbows (5).
Tighten all connections.
c.
Position cover plate (2) on screed (3).
d. Install self-locking machine screws (1) through
cover plate and into screed.
END OF TASK
2-1091/(2-1092 blank)