TM 5-3895-373-20
B.
INSTALL - Continued.
NOTE
Reconnection procedure for left hand
and right hand feed limit switch
harness connectors is the same.
Right hand feed limit switch harness
connector
is
shown
in
this
procedure.
5.
PLUG IN SCREED HARNESS CONNECTORS.
a.
Apply electrical insulating compound to pins of
left
and
right
feed
limit
switch
harness
connectors (1). Reconnect left and right screed
limit switch harness connectors.
b.
Apply electrical insulating compound to pins of
screed harness plug (2). Reconnect screed
harness connector at tractor bulkhead.
c.
Start up paving machine. Operate screed lift,
extension screed, and tow point movement
functions per TM 53895-373-10 and check
bulkhead fittings for leakage. Tighten fittings as
needed to stop leakage.
d.
Shut off engine and remove key from ignition
switch per TM 5-3895-373-10.
e.
Operate screed burner fuel pump per TM 5-
3895-37310 and check screed burner fuel hose
fitting for leakage at bulkhead. Tighten fitting as
needed to stop leakage.
END OF TASK
2-465