TM 5-3895-373-20E.INSTALL - Continued.2.INSTALL MAIN SCREED BLOWERASSEMBLIES AND FLEXIBLE PIPE.a.Connect flexible pipe (13) onto adapter(14) and place blower assembly (12) ontomain screed.b.Place cushions (11) above and belowblower assembly (12) and install motormounting clamp (10).c.Install flat washer (9) onto hex head capscrew (8).Thread locking compound can causeeye damage. Wear safetygoggles/glasses when using. Avoidcontact with eyes. If compoundcontacts eyes, flush eyes with waterand get immediate medical attention.d.Apply thread locking compound to hexhead cap screws (8).e.Install flat washers (9) and hex head capscrews (8). Tighten cap screws evenlyuntil motor is secure in cushions (11).f.Apply thread locking compound to thethreads on clamps (7 and 29).g.Install clamps (7 and 29) and hex nuts (6and 28). Tighten hex nuts evenly to 9 lb-ft12 N•m).h.Apply electrical insulating compound toblower electrical connector (4).i.Connect screed harness electricalconnector (5) to blower electricalconnector (4).GO TO NEXT PAGE14-71
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business