TM 5-3895-373-20
E.
INSTALL - Continued.
2.
INSTALL MAIN SCREED BLOWER
ASSEMBLIES AND FLEXIBLE PIPE.
a.
Connect flexible pipe (13) onto adapter
(14) and place blower assembly (12) onto
main screed.
b.
Place cushions (11) above and below
blower assembly (12) and install motor
mounting clamp (10).
c.
Install flat washer (9) onto hex head cap
screw (8).
Thread locking compound can cause
eye damage. Wear safety
goggles/glasses when using. Avoid
contact with eyes. If compound
contacts eyes, flush eyes with water
and get immediate medical attention.
d.
Apply thread locking compound to hex
head cap screws (8).
e.
Install flat washers (9) and hex head cap
screws (8). Tighten cap screws evenly
until motor is secure in cushions (11).
f.
Apply thread locking compound to the
threads on clamps (7 and 29).
g.
Install clamps (7 and 29) and hex nuts (6
and 28). Tighten hex nuts evenly to 9 lb-ft
12 Nm).
h.
Apply electrical insulating compound to
blower electrical connector (4).
i.
Connect screed harness electrical
connector (5) to blower electrical
connector (4).
GO TO NEXT PAGE
14-71
