Install air supply tank with two bolts in clamp brackets (fig. 3-114).
(9)
(10)
Install three clamp bolts holding air lines to tank (fig. 3-106).
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19) Install vacuum flow lever and gage plate (fig. 3-109) with four capscrews
(11), two nuts
(14), and two nuts (15).
(20)
(27)
Install eight bolts thru walkway and brackets (para 4-4).
(22)
(23) Set intake hoses and hand spray hose in
place (fig. 4-9).
(24)
(25)
(26)
(27)
Install two fuel lines to tank and secure with three clamps and bolts (fig. 3-106).
(28) Install eight nuts to
top of
tank to
frame spring mounting bolts (fig. 3-105). Tighten
nut until it just touches spring top then pull down one inch.
(29) Install microswitch (2, fig. 3-110) with attached bracket (3) secure bracket to
tank with
two screws (8).
(30) Install two clamps (4
and 6,
fig. 3-110) to
secure cables for microswitch
(2). Fasten
each pair of clamps to tank with screws (5 and 7).