• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 22. Main Bulkhead (View from Screed) -- Continued.
Table 23. Main Bulkhead (View from Engine) -- Continued.

Field Maintenance Manual For Bituminous Material Paving Machine - 3 Page Navigation
  62    63    64    65    66  67  68    69    70    71    72  
img
.
TM 5-3895-385-23-3
0441
Figure 23. Main Bulkhead (View from Engine).
Table 23. Main Bulkhead (View from Engine).
ITEM
NO.
ITEM DESCRIPTION
DESTINATION
1
Hose 54B is connected to bulkhead connector
Hose 54B is connected to LCB on Main
1.
Hydraulic Manifold (Figure 3, Item 10).
2
Hose 38B is connected to bulkhead connector
Hose 38B is connected to LSB on Main
2.
Hydraulic Manifold (Figure 3, Item 4).
3
Blank
4
Hose tee that splits from both spraydown hose
Spraydown hose to spraydown tank.
reels.
5
Hose 53 is connected to bulkhead connector 5.
Hose 53 is connected to C on left side of the
auger conveyor pump (DC).
6
Hose 27 is connected to bulkhead connector 6.
Hose 27 is connected to B on right side of the
auger conveyor pump (CB).
7
Electrical bulkhead connector.
Power from electric generator.
8
Blank
9
Hose 29B is connected to bulkhead connector
Hose 29B is connected to RSB on Main
9.
Hydraulic Manifold (Figure 3, Item 3).
10
Hose 55B is connected to bulkhead connector
Hose 55B is connected to RCB on Main
10.
Hydraulic Manifold (Figure 3, Item 6).
0441-30


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.