• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 23. Main Bulkhead (View from Engine) -- Continued.
Figure 24. Flow Divider Screed Extension Vibrator -- Location.

Field Maintenance Manual For Bituminous Material Paving Machine - 3 Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
img
TM 5-3895-385-23-3
0441
Table 23. Main Bulkhead (View from Engine) -- Continued.
ITEM
NO.
ITEM DESCRIPTION
DESTINATION
27
Hose 72A is connected to bulkhead connector
Hose 72A is connected to PCA on Main
27.
Hydraulic Manifold (Figure 3, Item 26).
28
Hose 62B is connected to bulkhead connector
Hose 62B is connected to tee on B of the right
28.
conveyor motor, which is connected to hose 52
which is connected to A on right side of the
auger conveyor pump (DA).
29
Hose 35B is connected to bulkhead connector
Hose 35B is connected to REB on Main
29.
Hydraulic Manifold (Figure 3, Item 5).
30
Hose 35A is connected to bulkhead connector
Hose 35A is connected to REA on Main
30.
Hydraulic Manifold (Figure 3, Item 22).
0441-32


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.