• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Side Right Plate Removal -- Continued
BEACON LIGHT ASSEMBLY REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1279    1280    1281    1282    1283  1284  1285    1286    1287    1288    1289  
img
TM 5-3895-385-23-2
0431
Side Right Plate Installation -- Continued.
6. Install floorboard gusset (Figure 1, Item 4) along with tether (Figure 1, Item 17), two bolts (Figure 1, Item 20),
new lock washers (Figure 1, Item 19), and flat washers (Figure 1, Item 18) onto floorboard (Figure 1, Item 5).
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
END OF TASK
END OF WORK PACKAGE
0431-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.