TM 5-3895-385-23-2
0425
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
MIDDLE ROLLER IDLER BOGIE ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Suitable lifting device (400 lb (181 kg) minimum)
Equipment Conditions
Web sling (WP 0440, Vol 3, Item 66)
Track removed (WP 0420)
Materials/Parts
Estimated Time to Complete Task
Lock washer (20) (WP 0439, Vol 3, Item 110)
3.5 hr
ROLLER IDLER ASSEMBLY REMOVAL AND INSTALLATION
NOTE
Middle roller idler bogie removal and installation steps are the same for both sides of the
Bituminous Material Paving Machine (BMPM). Left side shown.
0425-1