Figure 7. Auger Drive Chain Adjustment.
AUGER LIFT HYDRAULIC CYLINDER REMOVAL, INSPECTION, AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1143    1144    1145    1146    1147  1148  1149    1150    1151    1152    1153  
img
. .
TM 5-3895-385-23-2
0407
Auger Drive Chain Adjustment -- Continued.
1. Remove auger chain top cover and auger chain bottom cover from auger frame (perform steps 2 3 of Auger
Drive Chain Removal task).
2. Loosen jam nut (Figure 7, Item 1) and bolt (Figure 7, Item 2).
3. Loosen jam nut (Figure 7, Item 4).
NOTE
Turning counterclockwise will tighten the auger drive chain. Turning clockwise will loosen the
auger drive chain.
4. Turn adjustment bolt (Figure 7, Item 3) to set tension on auger drive chain to approximately one-quarter of an
inch (6.35 millimeters (mm)) of play (Figure 7, Item 5).
5. Tighten jam nut (Figure 7, Item 4).
6. Tighten bolt (Figure 7, Item 2) and jam nut (Figure 7, Item 1).
7. Install auger chain top cover and auger chain bottom cover onto auger frame (perform steps 6 7 of Auger
Drive Chain Installation task).
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Install screed (WP 0224).
END OF TASK
END OF WORK PACKAGE
0407-9/10 blank