TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
GRID HEATER WIRING HARNESS, RELAY, FUSE, AND SOLENOID REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Materials/Parts
Cable ties (WP 0439, Vol 3, Item 99)
Lock washer (4) (WP 0439, Vol 3, Item 108)
Lock washer (2) (WP 0439, Vol 3, Item 107)
Estimated Time to Complete Task
Lock washer (8) (WP 0439, Vol 3, Item 123)
15.7 hr
Lock washer (9) (WP 0439, Vol 3, Item 115)
GRID HEATER WIRING HARNESS REMOVAL AND INSTALLATION
CAUTION
Tag and label electrical wires prior to removal. Electrical wires must be installed correctly for
proper operation. Failure to comply may cause damage to equipment.
NOTE
It will be necessary to remove cable ties from cables.