TM 5-3895-385-23-2
0359
FOLLOW-ON TASK
1. Remove lifting device.
2. Install cable ties where necessary.
5. Verify proper operation, and check for fluid leaks.
6. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE