Figure 2. Screed Vibrator Hydraulic Hose.
SCREED CROWN MOTOR HYDRAULIC HOSE REMOVAL, INSPECTION, AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  386    387    388    389    390  391  392    393    394    395    396  
img
. .
TM 5-3895-385-23-2
0286
Screed Vibrator Hydraulic Hose Installation -- Continued.
1. Install hydraulic hose 98A (Figure 2, Item 15) into bracket (Figure 2, Item 17).
2. Remove caps/plugs from hydraulic hoses (Figure 2, Items 2, 4, 5, 7, 8, 9, 11, 14, and 15) and hydraulic
fittings.
3. Connect hydraulic hose 98A (Figure 2, Item 15) to main bulkhead (Figure 2, Item 1) and left screed vibrator
(Figure 2, Item 16).
4. Connect hydraulic hose 113 (Figure 2, Item 14) to vibrator adjustment knob (Figure 2, Item 13) and left screed
vibrator (Figure 2, Item 16).
5. Connect hydraulic hose 112 (Figure 2, Item 11) to vibrator adjustment knob (Figure 2, Item 13) and screed
vibrator flow divider (Figure 2, Item 12).
6. Connect hydraulic hose 92 (Figure 2, Item 9) to right screed vibrator (Figure 2, Item 6) and left screed vibrator
(Figure 2, Item 16).
7. Connect hydraulic hose 93 (Figure 2, Item 8) to right screed vibrator (Figure 2, Item 6) and screed vibrator
flow divider (Figure 2, Item 12).
8. Connect hydraulic hose 104 (Figure 2, Item 7) to right screed vibrator (Figure 2, Item 6) and screed extension
charge filter manifold (Figure 2, Item 10).
9. Connect hydraulic hose 103 (Figure 2, Item 5) to right screed vibrator (Figure 2, Item 6) and screed vibrator
flow divider (Figure 2, Item 12).
10. Connect hydraulic hose 109 (Figure 2, Item 4) to right screed vibrator (Figure 2, Item 6) and left screed
vibrator (Figure 2, Item 16).
11. Install hydraulic hose 98B (Figure 2, Item 2) into bracket (Figure 2, Item 3).
12. Connect hydraulic hose 98B (Figure 2, Item 2) to main bulkhead (Figure 2, Item 1) and screed vibrator flow
divider (Figure 2, Item 12).
END OF TASK
FOLLOW-ON TASK
1. Install screed covers (WP 0249).
2. Verify proper operation.
3. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedures
(SOP).
END OF TASK