TM 5-3895-385-23-2
0270
Worklights Rocker Switch Installation
1. Install worklights rocker switch (Figure 1, Item 1) into pedestal assembly, and ensure two retention tabs
(Figure 1, Item 2) lock into position.
WARNING
DC voltages are present at BMPM electrical components even when the unit is shut down. Avoid
shorting any positive with ground/negative. Do not ground yourself in standing water. Failure to
comply may cause injury or death to personnel and damage to equipment.
2. Connect cables (Figure 1, Item 3) to worklights rocker switch (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASK
2. Verify proper operation.
END OF TASK
END OF WORK PACKAGE