• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WORKLIGHTS ROCKER SWITCH REMOVAL AND INSTALLATION
Worklights Rocker Switch Installation

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  287    288    289    290    291  292  293    294    295    296    297  
img
.
TM 5-3895-385-23-2
0270
WORKLIGHTS ROCKER SWITCH REMOVAL AND INSTALLATION
Worklights Rocker Switch Removal
Figure 1. Worklights Rocker Switch
WARNING
Direct Current (DC) voltages are present at Bituminous Material Paving Machine (BMPM)
electrical components even when the unit is shut down. Avoid shorting any positive with
ground/negative. Do not ground yourself in standing water. Failure to comply may cause injury or
death to personnel and damage to equipment.
1. Disconnect cables (Figure 1, Item 3) from worklights rocker switch (Figure 1, Item 1).
2. Press two retention tabs (Figure 1, Item 2), and remove worklights rocker switch (Figure 1, Item 1) from
pedestal assembly.
END OF TASK
0270-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.