TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
CONTROL PEDESTAL DISPLAY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Materials/Parts
Locking nut (4) (WP 0439, Vol 3, Item 41)
Estimated Time to Complete Task
1.5 hr
CONTROL PEDESTAL DISPLAY REMOVAL AND INSTALLATION
NOTE
Control pedestal display removal and installation steps are the same for both sides of the
Bituminous Material Paving Machine (BMPM). Left side shown.