TM 5-3895-385-23-2
0255
FOLLOW-ON TASK
1. Install screed extension hydraulic cylinder (WP 0254).
2. Verify proper operation, and check for fluid leaks.
3. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE