SCREED EXTENSION SLIDE PLATE ASSEMBLY REMOVAL AND INSTALLATION - Continued
Figure 1. Screed Extension Upper Screed Slide Rail Bar Adjustment.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  149    150    151    152    153  154  155    156    157    158    159  
img
.
TM 5-3895-385-23-2
0248
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
SCREED EXTENSION UPPER SCREED SLIDE RAIL BAR ADJUSTMENT
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Screed extensions fully extended (TM 5-3895-385-
3, Item 64)
10)
Suitable lifting device (500 lb (227 kg) minimum)
Screed fully raised (TM 5-3895-385-10)
Web sling (WP 0440, Vol 3, Item 66)
Screed locking pins installed (TM 5-3895-385-10)
Personnel Required
Engine off (TM 5-3895-385-10)
91L
BATTERY DISCONNECT switch OFF (TM 5-3895-
Assistant
385-10)
Estimated Time to Complete Task
1 hr
0248-1